Opening Lahan. Frontage will be used for rambutan orchard worked all together, like a bully plants & shrubs & grasses thrown hard Banteng88 Agen Casino Resmi Promo 100% SBOBET IBCBET Jelang Piala Dunia 2014objects eliminated then the land is plowed / hoed. When seedling grafts derived from land treatment should not be too viewed but if the grafting yield to treatment in the elbow. Then create a 1 meter wide water channel & adapted into the depth of the groundwater, sewage disposable overcome inattentive smoothly. Land & less rake or soil humus pretty hard given the green manure is made in a way to bury the branches & leaves & condition is left for approximately 1 year.
Formation of Embankment. : Once the soil conditions make the soil friable & Embankment man-sized, 8 m width & height of about 30 cm by flattening it in order to shore up bottom-be seeds planted long suit wide yard / rice fields. But ideally Embankment approximately 10 m long, with the longitudinal direction from north to south, so get plenty of sunshine in the morning even after being given the awning, the distance between the furrows 1 m intended for traffic workers & can be used as a conduit for water removal , & to increase fertility can be green manure, compost / manure mature me-downs
Liming: Liming in plain derived from the causeway & also new-formed plains can not be planted, as well as land was still very acidic also not too Banteng88 Agen Casino Resmi Promo 100% SBOBET IBCBET Jelang Piala Dunia 2014fertile, having dug holes the size of planting in the grounds & sprinkled lime essence of 0,5 liters each hole in order to neutralize the pH of the soil to achieve growth of 6 to 6.7 as a condition of rambutan crop, after 1 week of sowing manure and lime given that land to be fertile.
Fertilizing: After a period of one week from the granting of chalk in the holes specified then given manure by 25 kg (approximately 1 tin) and after 1 week of new land ready for planting the seeds of what has been so rambutan.
6.3. Planting Techniques
Defining Patterns of Plants: The completion of the base of the tree should go through the process of germination and then grown in a 10 x 10 cm after sprout & 1-1.5 months old or has sprouted leaves of 3 pieces of the seed / zaeling be moved in the soil into two with a 1 - 14 meters. To avoid the sting of direct sunlight made sloping roofs turned higher to the East with a view to get the morning sun in full.
Hole Manufacturing Plant: Manufacture of holes in the soil, the soil what has been prepared for the planting of seeds of rambutan-me-downs so done after soil treated maturely then made holes with a size of 1 x 1 x 0.5 m YG should have prepared 3-4 week before & during the excavation of frontage on & YG brunt separated later used to cover the hole back what has been given crop, while the distance between the holes around 12-14 m.
How to Plant: After last for 2 week hole closed by order of the ground as usual & frontage top 3 returned after mixed with tin (1 tin about 20 liters) of mature manure-me-downs, & about 4 towns & frontage in the former pit mines has begun to decline new rambutan grown & does not need too viewed down, meaning the lines between roots & stems cultivated rambutan existing high ground around it.
Others: At the beginning of the planting of the garden should be protected YG skeleton made from bamboo / other materials with relatively high mounted position next to the East, so that plants get more sunlight in the morning than in the afternoon, & for the roof can be made of palm leaves, oil / sugar. Planting should be done atBadak88 Agen Judi Online Promo 100% SBOBET IBCBET Sambut Piala Dunia 2014 the beginning of the rainy season, so that water needs can be met by naturalists.